Skip to content

Nicholas Street Sewer Extension – Phase II

Location: Omaha, NE
Owner: City of Omaha, Public Works Deptartment
Completed: October 2016

This project was created to provide additional sewer cacity to the Omaha area. For Super Excavators, the scope of work included: 910 lf of 108-in. reinforced concrete pipe and 1,040 lf of 84-in. reinforced concrete pipe constructed by conventional tunneling methods; construction of 28 storm sewer and sanitary sewer tunneling work shaft pits; 70 lf of 24-in. RCP and 4,850 lf of 24-in. VCP by guided boring machine; approximately 2,200 lf of 12- to 54-in. RCP by open-cut; bypass pumping; and numerous connections to existing and new storm sewer and sanitary sewer structures.

DOWLOAD PDF