Location: Milwaukee, WI
Completed: January 2002
This project was performed in winter during the low flow periods. Teamed up with Earth Tech and Quality Videos we Inspected 17,000 Lineal Feet of the 300′ deep Inline Storage System (a.k.a. The Deep Tunnel) in Milwaukee, WI.